Grid-tied Industrial · Cebu City
300kW Grid-Tied Industrial Solar System
The Challenge
Industrial facilities in Cebu City often carry high daytime electricity costs driven by continuous equipment operation. A grid-tied solar system offers a way to offset that consumption without disrupting existing operations or requiring battery storage.
The Solution
Fortune 9 designed and installed a 300kW grid-tied photovoltaic system, engineered to Philippine Electrical Code standards with full documentation for utility interconnection, sized to the facility's rooftop and daytime load profile.
The Outcome
The system is commissioned and generating power, offsetting daytime grid consumption for the facility.