1.5MW+ Installed
2 Cebu Warehouses
1-Year Warranty (RA 7394)
LiFePO4 · Pure Sine Wave
200kW Grid-Tied Industrial Solar System
200kW · Grid-tied Industrial

Grid-tied Industrial · Bacolod City

200kW Grid-Tied Industrial Solar System

200kWSystem Size
Grid-tied IndustrialSystem Type
Bacolod CityLocation

The Challenge

Industrial operations in Bacolod City face the same daytime demand charges as their Cebu counterparts, alongside the added logistics of coordinating an installation outside Fortune 9's home service area.

The Solution

Fortune 9 designed and installed a 200kW grid-tied photovoltaic system, sized to the facility's rooftop and daytime load profile, with engineering documentation prepared for local utility interconnection.

The Outcome

The system is commissioned and generating power, offsetting daytime grid consumption for the facility.

Planning a Similar Project?

Contact us for a free site assessment and detailed financial model for your facility.

Get a Quote

Stay Powered Up

Promotions, Solar Tips, and Industry News

Occasional emails when we run a promotion, publish a usage tip, or there's news worth sharing. No spam, unsubscribe any time.

CallWhatsAppGet a Quote