Grid-tied Industrial · Bacolod City
200kW Grid-Tied Industrial Solar System
The Challenge
Industrial operations in Bacolod City face the same daytime demand charges as their Cebu counterparts, alongside the added logistics of coordinating an installation outside Fortune 9's home service area.
The Solution
Fortune 9 designed and installed a 200kW grid-tied photovoltaic system, sized to the facility's rooftop and daytime load profile, with engineering documentation prepared for local utility interconnection.
The Outcome
The system is commissioned and generating power, offsetting daytime grid consumption for the facility.